Transformer Bank Foundations (2016)

San Bernardino County, CA

Transformer Bank Foundations (2016)

Project Type:
Civil
Load:
66kV, 12kV
Location:
San Bernardino County, CA
Scope:

Remove and replace two (2) 66/12kV Transformer Bank foundations, including all associated conduit and grounding.

More Projects

EMP Shielded MEER Foundation (2023)

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)

Hydroelectric Powerhouse Test Support (2023)

Test
220kV
Substation Electrical Installation (2023)

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV
Substation Build (2023)

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)

Substation Wall (2022)

Civil
Scroll to Top