Substation Electrical Installation (2023)

Kern County, CA

Substation Electrical Installation (2023)

Project Type:
Electrical
Load:
34.5kV, 220kV
Location:
Kern County, CA
Scope:

To perform the electrical installation on this project. This involves furnishing and installing various electrical equipment, components and materials. HV and MV Surge Arresters, Electrical Reactors, HV and MV Disconnect Switches, HV, MV and LV Cables, MV CT/PTs, Control Enclosure integration, Welded/Compressed/Bolted AL Bus Bar, Cooling system, Lightning Protection, Service station supply, Grounding grid.

More Projects

EMP Shielded MEER Foundation (2023)

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)

Hydroelectric Powerhouse Test Support (2023)

Test
220kV
Substation Electrical Installation (2023)

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV
Substation Build (2023)

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)

Substation Wall (2022)

Civil
Scroll to Top