Switchrack Installation (2023)

Los Angeles County, CA

Switchrack Installation (2023)

Project Type:
Civil, Electrical
Load:
66kV, 220kV
Location:
Los Angeles County, CA
Scope:
  • Install new Station Light and Power (SL&P) foundations with integrated cast in place cable trench.
  • Install all SL&P equipment and temp connections to new pad mount transformers.
  • Pothole and relocate existing water line for the new 66kV rack.
  • Install structural civil for thirty-five (35) new 66kV Switchrack positions including foundations, cable trenches, below grade conduit and grounding.
  • Install high voltage electrical for thirty-five (35) new 66kV Switchrack positions including steel, equipment, grounding, conductor, and conduit.
  • Span new conductor from 220kV/66kV main power transformers to new switchrack.
  • Install RGBs, temp jumpers from old 66kV rack to new 66kV rack.
  • Pothole and relocate existing water line for the new 66kV rack.

More Projects

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV

Hydroelectric Powerhouse Test Support (2023)

Test
220kV

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV

Substation Wall (2022)

Civil
Scroll to Top