Substation Update (2014)

Orange County, CA

Substation Update (2014)

Project Type:
Civil, Electrical
Load:
220kV, 66kV
Location:
Orange County, CA
Scope:
  • Installation of 66kV Circuit Breakers, Gang-Operated Disconnect Switches, Horizontal Disconnect Switches, 66kV Operating and Transfer Busses, Line PT’s, all associated conductoring and grounding.
  • Remove and replace three (3) 220/66kV Transformer Banks, including all associated primary conductoring, secondary wiring, and grounding.
  • Install one (1) 18’x 12’x 8’ vault with manhole.
  • Encase and slurry eight (8) 5” PVC conduits from power cable trench to new vault (400’).
  • Encase and slurry nine (9) 5” PVC conduits from new vault to fence line (400’).
  • Rock Dust 100’ x 80’ area.

More Projects

EMP Shielded MEER Foundation (2023)

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)

Hydroelectric Powerhouse Test Support (2023)

Test
220kV
Substation Electrical Installation (2023)

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV
Substation Build (2023)

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)

Substation Wall (2022)

Civil
Scroll to Top