MEER Wiring (2013)

Los Angeles County, CA

MEER Wiring (2013)

Project Type:
Wiring
Load:
220kV, 66kV, 16kV
Location:
Los Angeles County, CA
Scope:

Perform wiring inside MEER building:

  • Install automation for new upgraded equipment.
  • Complete installation and wiring of forty-nine (49) new substation protection panels.
  • Complete wiring for ten (10) 220kV circuit breakers.
  • Complete wiring for thirty-three (33) 66kV circuit breakers.
  • Complete wiring for twenty-four (24) 16kV circuit breakers.
  • Build, wire and install three (3) new 19” relay racks.
  • Replace old RTU and PLC cabinets.
  • Pull all new homerun cables.

More Projects

EMP Shielded MEER Foundation (2023)

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)

Hydroelectric Powerhouse Test Support (2023)

Test
220kV
Substation Electrical Installation (2023)

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV
Substation Build (2023)

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)

Substation Wall (2022)

Civil
Scroll to Top