Line Replacement (2022)

Los Angeles County, CA

Line Replacement (2022)

Project Type:
Civil, Electrical
Load:
220kV
Location:
Los Angeles County, CA
Scope:

Replace three (3) 220kV lines including the following at each:

  • Bank side disconnect switch with ground attachment along with the structure and foundation.
  • Line side disconnect switch including structure and foundation.
  • Bus side disconnect switch along with the structure and foundation.
  • Bus support insulator.
  • Conductor with three (3) 2156 KCMIL ACSR per phase.

More Projects

EMP Shielded MEER Foundation (2023)

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)

Hydroelectric Powerhouse Test Support (2023)

Test
220kV
Substation Electrical Installation (2023)

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV
Substation Build (2023)

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)

Substation Wall (2022)

Civil
Scroll to Top