Skip to content
Facebook
Linkedin
Get In Touch
Generation Station Electrical Upgrade (2012)
Orange County, CA
Generation Station Electrical Upgrade (2012)
Project Type:
Electrical
Load:
66kV
Location:
Orange County, CA
Scope:
Install new Human Interface Rack (HMI).
Remove existing obsolete HMI/PLC cabinet.
Replace three (3) existing compact Programmable Logic Controllers (PLCs) with new Quantum PLCs.
Upgrade existing SAS elementary diagrams and rack wiring per latest SAS standards.
Install LSR Auto/Solid switch for the existing 66kV HCB relays.
Replace PLC annunciator alarm splitting diodes with auxiliary relays.
Prepare the necessary programming for the substation’s automatic response to pre-defined conditions.
Using a software simulator, verify the proper operation of this program.
Replace 66kV Bus Tie GCX and JBCG relays with SEL-311C relays.
More Projects
EMP Shielded MEER Foundation (2023)
Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)
Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)
Test
220kV
Substation Electrical Installation (2023)
Electrical
34.5kV, 220kV
Substation Build (2023)
Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)
Civil
View All Projects
Scroll to Top
Home
About
Our Team
Careers
Services
Projects
Blog
Follow Us
Facebook
Linkedin
Employee Portal
[email protected]
TEL: 714-698-0930
FAX: 714-643-6003
174 E Liberty Ave., Anaheim, CA 92801
Send us a message
Name
Email
Message
Send
Follow Us
Facebook
Linkedin