ATS Installation (2015)

San Bernardino County, CA

ATS Installation (2015)

Project Type:
Civil, Electrical
Load:
480VAC
Location:
San Bernardino County, CA
Scope:
  • Installation of one (1) 15’x30’ ATS Foundation, 1000’ of six (6) 5” PVC Duct Bank, two (2) three-phase 1000A ATS.
  • Pull and terminate all associated power cables.
  • Demo 1S SL&P and 2S SL&P.
  • Demo existing 1S SL&P and 2S SL&P foundations.
  • Install two (2) vaults for SL&P pad mounted transformers including all associated conduits and grounding.
  • Install primary and secondary cables for SL&P transformers.
  • Install new ATS foundation including eight (8) 5” PVC duct banks.
  • Install two (2) three-phase 1000A rated ATS.
  • Install SPC panel and wire from ATS switches.
  • Pull secondary cables from 1S SL&P and 2S SL&P from main CB to ATS switches.
  • All work done under OSHA confined space entry rules.

More Projects

EMP Shielded MEER Foundation (2023)

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV
Switchrack Installation (2023)

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV
Hydroelectric Powerhouse Test Support (2023)

Hydroelectric Powerhouse Test Support (2023)

Test
220kV
Substation Electrical Installation (2023)

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV
Substation Build (2023)

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV
Substation Wall (2022)

Substation Wall (2022)

Civil
Scroll to Top