MEER Building (2021)

Project Type:
Civil
Location:
Orange County, CA
Scope:
  • Contract with Trachte to procure MEER building for customer.
  • Clear and grub area, survey and grade area for new MEER building.
  • Install MEER foundation including built in trench systems and stairs.
  • Coordinate traffic control and delivery of three (3) piece building and restroom being shipped in three (3) oversize loads.
  • Use a crane to pick and set building pieces and restroom on new foundations.
  • Install building and secure to the foundation, reinstall facilities and electrical systems including grounding and cable tray.
  • Install back up batteries for MEER equipment.
  • Install restroom on new foundations and make final plumbing connection.

More Projects

EMP Shielded MEER Foundation (2023)

Civil
12kV, 22kV, 66kV

Switchrack Installation (2023)

Civil, Electrical
66kV, 220kV

Hydroelectric Powerhouse Test Support (2023)

Test
220kV

Substation Electrical Installation (2023)

Electrical
34.5kV, 220kV

Substation Build (2023)

Civil, Electrical, Test
12kV, 66kV

Substation Wall (2022)