Yukon Substation
Hawthorne, CA
Yukon Substation
Customer:
Southern California Edison
Load:
16kV, 66kV
Date:
08/2020
Scope:
Replace nineteen (19) 16kV CB’s.
Demo 16kV Positions 4 & 11.
Replace one (1) 66kV CB.
Replace all homerun and jumper cables.
Split existing pilot wire differential relay (HCB) and directional overcurrent (DPU) protection Relays.
Install three (3) new Auxiliary CTs between existing HCB Relay and existing ROTO 404 Switch on Panel 1R.
Replace two (2) 16kV switchrack DC distribution panels.
Test and isolate old cables for demo.
Compile all new and existing prints for one (1) Station set.
More Projects
Lighthipe Substation
Southern California Edison
12kV, 22kV, 66kV
Windsor Hills Substation
Southern California Edison
4kV, 16kV, 66kV
Barren Ridge Substation
LADWP
34.5kV, 220kV
Medicine Substation
Southern California Edison
12kV, 66kV
Del Amo Substation Fence
Southern California Edison
Estero Substation
Southern California Edison
16kV, 66kV
View All Projects
Scroll to Top
Home
About
Our Team
Careers
Services
Projects
Blog
Follow Us
Facebook
Linkedin
Employee Portal
[email protected]
TEL: 714-698-0930
FAX: 714-643-6003
174 E Liberty Ave., Anaheim, CA 92801
Send us a message
Name
Email
Message
Send
Follow Us
Facebook
Linkedin