Skip to content
Facebook
Linkedin
Get In Touch
Windsor Hills Substation
Los Angeles, CA
Windsor Hills Substation
Customer:
Southern California Edison
Load:
4kV, 16kV, 66kV
Date:
06/2023
Scope:
Install temporary AC/DC feeds.
Replace three (3) 66kV CBs.
Replace 66kV Line PTs.
Equip with new 16kV CB and three (3) sets of Disconnects and IPS retention.
Replace 16kV SL&P.
Install one (1) 1200/5A CT, pull box mounted on Cap structure for new CT and replace primary conductor.
Rebuild 4kV Open Air Switchrack.
Install Relay Racks Z01-Z08, upgrade 4kV/16kV and 66kV Protection Relays, Replace existing 66kV Line HCBs.
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
Procore
More Projects
Windsor Hills Substation
Southern California Edison
4kV, 16kV, 66kV
Cudahy Substation
Southern California Edison
4kV, 16kV, 66kV
Barren Ridge Substation
LADWP
34.5kV, 220kV
Cadillac/Yorktown Substation
Baker Electric
34.5kV
Medicine Substation
Southern California Edison
12kV, 66kV
Sharp Phase III Wall
City of Anaheim
View All Projects
Scroll to Top
Home
About
Our Team
Services
Projects
Blog
Follow Us
Facebook
Linkedin
Employee Portal
[email protected]
TEL: 714-698-0930
FAX: 714-643-6003
174 E Liberty Ave., Anaheim, CA 92801
Send us a message
Name
Email
Message
Send
Follow Us
Facebook
Linkedin