Vincent Substation

Palmdale, CA

Vincent Substation

Customer:
Southern California Edison
Load:
220kV
Date:
06/2022
Scope:

Replace three (3) 220kV Lines including the following at each:

  • Bank side disconnect switch with ground attachment along with the structure and foundation.
  • Line side disconnect switch including structure and foundation.
  • Bus side disconnect switch along with the structure and foundation.
  • Bus support insulator.
  • Conductor with three (3) 2156 KCMIL ACSR per phase.