Scope:
Replace ~5107sqft of 4” AC over 8” Type II AB and install ~640lf of AC berm with seven (7) brass valves, and a new AC ramp near South Entrance Gate.
Stripe new berms and ramps.
Construct new swales (6’ swale ~198lf and 3’ swale ~ 563lf).
Bring swale to existing drainage canal and sawcut and remove 3” from top of canal. Match to swale and adjust to maintain positive flow.
Install two (2) 4’x4’ concrete aprons, a new concrete walkway, and new concrete curbs near swales.
Install four (4) HSS drainage crossovers.
Grade areas as needed for proper flow.
More Projects
Lighthipe Substation
Southern California Edison
12kV, 22kV, 66kV
Big Creek 3 Hydroelectric Powerhouse
Southern California Edison
220kV
Windsor Hills Substation
Southern California Edison
4kV, 16kV, 66kV
Barren Ridge Substation
LADWP
34.5kV, 220kV
Medicine Substation
Southern California Edison
12kV, 66kV
Del Amo Substation Fence
Southern California Edison
View All Projects
Scroll to Top
Home
About
Our Team
Careers
Services
Projects
Blog
Follow Us
Facebook
Linkedin
Employee Portal
[email protected]
TEL: 714-698-0930
FAX: 714-643-6003
174 E Liberty Ave., Anaheim, CA 92801
Send us a message
Name
Email
Message
Send
Follow Us
Facebook
Linkedin