Victor Substation

Victorville, CA

Victor Substation

Customer:
Southern California Edison
Date:
07/2022
Scope:
  • Replace ~5107sqft of 4” AC over 8” Type II AB and install ~640lf of AC berm with seven (7) brass valves, and a new AC ramp near South Entrance Gate.
  • Stripe new berms and ramps.
  • Construct new swales (6’ swale ~198lf and 3’ swale ~ 563lf).
  • Bring swale to existing drainage canal and sawcut and remove 3” from top of canal. Match to swale and adjust to maintain positive flow.
  • Install two (2) 4’x4’ concrete aprons, a new concrete walkway, and new concrete curbs near swales.
  • Install four (4) HSS drainage crossovers.
  • Grade areas as needed for proper flow.

More Projects

Lighthipe Substation

Southern California Edison
12kV, 22kV, 66kV

Big Creek 3 Hydroelectric Powerhouse

Southern California Edison
220kV

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Medicine Substation

Southern California Edison
12kV, 66kV

Del Amo Substation Fence

Southern California Edison
Scroll to Top