Customer:
EPC Services
Load:
66kV, 34.5kV
Date:
12/2021
Scope:
  • Install foundations and below grade conduit/grounding for six (6) 66kV Transformers, three (3) 66kV Disconnect, two (2) 66kV CB’s, three (3) 34.5kV CB’s, station services, MEER and associated structures.
  • Install all equipment, steel, above grade conduit and grounding for the following six (6) 66kV Transformers, three (3) 66kV Disconnect, two (2) 66kV CB’s, three (3) 34.5kV CB’s, station services, MEER and associated structures.
  • Construct CMU wall around both sites.

More Projects

Lighthipe Substation

Southern California Edison
12kV, 22kV, 66kV

Big Creek 3 Hydroelectric Powerhouse

Southern California Edison
220kV

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Medicine Substation

Southern California Edison
12kV, 66kV

Del Amo Substation Fence

Southern California Edison
Scroll to Top