Skip to content
Facebook
Linkedin
Get In Touch
Santa Fe Springs Substation
Santa Fe Springs, CA
Santa Fe Springs Substation
Customer:
Southern California Edison
Load:
kV
Date:
08/2019
Scope:
Install one (1) 18’x 12’x 8’ vault with manhole.
Encase and slurry eight (8) 5” PVC conduits form power cable trench to new vault (400’).
Encase and slurry nine (9) 5” PVC conduits form new vault to fence line (400’).
Rock Dust 100’ x 80’ area to meet SCE standards.
More Projects
Windsor Hills Substation
Southern California Edison
4kV, 16kV, 66kV
Cudahy Substation
Southern California Edison
4kV, 16kV, 66kV
Barren Ridge Substation
LADWP
34.5kV, 220kV
Cadillac/Yorktown Substation
Baker Electric
34.5kV
Medicine Substation
Southern California Edison
12kV, 66kV
Sharp Phase III Wall
City of Anaheim
View All Projects
Scroll to Top
Home
About
Our Team
Services
Projects
Blog
Follow Us
Facebook
Linkedin
Employee Portal
[email protected]
TEL: 714-698-0930
FAX: 714-643-6003
174 E Liberty Ave., Anaheim, CA 92801
Send us a message
Name
Email
Message
Send
Follow Us
Facebook
Linkedin