Santa Fe Springs Substation

Santa Fe Springs, CA

Santa Fe Springs Substation

Customer:
Southern California Edison
Load:
kV
Date:
08/2019
Scope:
  • Install one (1) 18’x 12’x 8’ vault with manhole.
  • Encase and slurry eight (8) 5” PVC conduits form power cable trench to new vault (400’).
  • Encase and slurry nine (9) 5” PVC conduits form new vault to fence line (400’).
  • Rock Dust 100’ x 80’ area to meet SCE standards.

More Projects

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Cudahy Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Cadillac/Yorktown Substation

Baker Electric
34.5kV

Medicine Substation

Southern California Edison
12kV, 66kV