Sunnyside Substation

Long Beach, CA

Sunnyside Substation

Customer:
Southern California Edison
Load:
66kV, 12kV, 4kV
Date:
06/2014
Scope:
  • Remove all existing control, current, AC and DC cables for all 66kV, 12kV, and 4kV CB’s.
  • Install new control, current, AC and DC cables for all 66kV, 12kV, and 4kV CB’s.
  • Provide test support for cable upgrade.
  • Trace out wiring and as built sixteen (16) relay panels.