Scope:
  • Demo 5,800’ of chain link fencing.
  • Grade entire perimeter.
  • Excavate and pour 2’ deep x 5,800’ long grade beam.
  • Install 5,800’ of BETA Guardian 5,000 fencing, barbed wire on top of each fence post, 11,600’ of 4/0 ground grid and two (2) 20’ swing gates.