Remove and replace the SL&P in the 12kV Bus tie with one (1) new 25kva Transformer, one (1) set of fuse disconnects, three (3) 12kV, 1200A Circuit Breakers, fourteen (14) sets of 12kV, 1200A hook-stick, operated disconnects.
Upgrade dead end to the latest seismic standard by replacing the operating bus jumpers, replace suspension insulators and weights, install seismic bracing to meet latest standards.