Laguna Bell Substation

Commerce, CA

Laguna Bell Substation

Customer:
Southern California Edison
Load:
66kV
Date:
04/2021
Scope:
  • Demo existing foundations. Install fourteen (14) 66kV CB foundations.
  • Replace fourteen (14) 66kV CBs.
  • Install 3′ chain link barrier in 16kV and 220kV rack.
  • Replace twenty-four (24) sets of vertically group operated disconnect switches. Replace ten (10) sets of vertically group operated disconnect switches.
  • Demo existing foundations, install one (1) PT1 and two (2) F30-8/A1-2.
  • Remove metering unit and PT, replace with two (2) new PTs and two (2) CTs.
  • Core drill, install five (5) 19″ racks.

More Projects

Lighthipe Substation

Southern California Edison
12kV, 22kV, 66kV

Big Creek 3 Hydroelectric Powerhouse

Southern California Edison
220kV

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Medicine Substation

Southern California Edison
12kV, 66kV

Del Amo Substation Fence