Install 3′ chain link barrier in 16kV and 220kV rack.
Replace twenty-four (24) sets of vertically group operated disconnect switches. Replace ten (10) sets of vertically group operated disconnect switches.
Demo existing foundations, install one (1) PT1 and two (2) F30-8/A1-2.
Remove metering unit and PT, replace with two (2) new PTs and two (2) CTs.