Laguna Bell Substation

Commerce, CA

Laguna Bell Substation

Customer:
Southern California Edison
Load:
66kV
Date:
04/2021
Scope:
  • Demo existing foundations. Install fourteen (14) 66kV CB foundations.
  • Replace fourteen (14) 66kV CBs.
  • Install 3′ chain link barrier in 16kV and 220kV rack.
  • Replace twenty-four (24) sets of vertically group operated disconnect switches. Replace ten (10) sets of vertically group operated disconnect switches.
  • Demo existing foundations, install one (1) PT1 and two (2) F30-8/A1-2.
  • Remove metering unit and PT, replace with two (2) new PTs and two (2) CTs.
  • Core drill, install five (5) 19″ racks.

More Projects

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Cudahy Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Cadillac/Yorktown Substation

Baker Electric
34.5kV

Medicine Substation

Southern California Edison
12kV, 66kV

Sharp Phase III Wall

City of Anaheim
Scroll to Top