La Fresa Substation

Torrance, CA

La Fresa Substation

Customer:
Southern California Edison
Load:
220kV
Date:
04/2019
Scope:
  • Replace existing Single-Insulator Bus Jumpers on the 220kV Bus Dead-End Structures with new V-String Suspension Jumper Supports per Phase – total of four (4) Bus Dead-End Structures.
  • Reconductor ‘A’ Phase on North Bus to adjacent Disconnect Switches for ten (10) 220kV Positions.
  • Replace tie downs and CCVT structures and equipment with new seismic rated foundations and tie down equipment for ten (10) 220kV positions.
  • Reconductor A, B, and C Phases from Eastern North Bus Dead-End Structure to 220kV No. 6 Cap Bank Bus Disconnects.
  • Import and spread 770 tons of rockdust in the 220kV and 66kV Switchrack per Edison standards.

More Projects

Lighthipe Substation

Southern California Edison
12kV, 22kV, 66kV

Big Creek 3 Hydroelectric Powerhouse

Southern California Edison
220kV

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Medicine Substation

Southern California Edison
12kV, 66kV

Del Amo Substation Fence

Southern California Edison