Huntington Beach Generation Station

21730 Newland St., Huntington Beach, USA

Huntington Beach Generation Station

Customer:
Southern California Edison
Load:
12kV
Date:
02/2012
Scope:
  • Install new Human Interface Rack (HMI).
  • Remove existing obsolete HMI/PLC cabinet.
  • Replace three (3) existing compact Programmable Logic Controllers (PLCs) with new Quantum PLCs.
  • Upgrade existing SAS elementary diagrams and rack wiring per latest SAS standards.
  • Install LSR Auto/Solid switch for the existing 66kV HCB relays.
  • Replace PLC annunciator alarm splitting diodes with auxiliary relays.
  • Prepare the necessary programming for the substation’s automatic response to pre-defined conditions.
  • Using a software simulator, verify the proper operation of this program.
  • Replace 66kV Bus Tie GCX and JBCG relays with SEL-311C relays.

More Projects

Hollywood Park Substation

Southern California Edison
kV

Hinson Substation

Southern California Edison
kV

Center Substation

Southern California Edison
kV

Alamitos Substation

Southern California Edison
kV

Laguna Bell

Southern California Edison
kV

Rio Hondo

Southern California Edison
kV
Scroll to Top