Huntington Beach Generation Station

Huntington Beach, CA

Huntington Beach Generation Station

Customer:
Southern California Edison
Load:
66kV
Date:
02/2012
Scope:
  • Install new Human Interface Rack (HMI).
  • Remove existing obsolete HMI/PLC cabinet.
  • Replace three (3) existing compact Programmable Logic Controllers (PLCs) with new Quantum PLCs.
  • Upgrade existing SAS elementary diagrams and rack wiring per latest SAS standards.
  • Install LSR Auto/Solid switch for the existing 66kV HCB relays.
  • Replace PLC annunciator alarm splitting diodes with auxiliary relays.
  • Prepare the necessary programming for the substation’s automatic response to pre-defined conditions.
  • Using a software simulator, verify the proper operation of this program.
  • Replace 66kV Bus Tie GCX and JBCG relays with SEL-311C relays.

More Projects

Lighthipe Substation

Southern California Edison
12kV, 22kV, 66kV

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Medicine Substation

Southern California Edison
12kV, 66kV

Del Amo Substation Fence

Southern California Edison

Estero Substation

Southern California Edison
16kV, 66kV
Scroll to Top