Huntington Beach Generation Station

Huntington Beach, CA

Huntington Beach Generation Station

Customer:
Southern California Edison
Load:
66kV
Date:
02/2012
Scope:
  • Install new Human Interface Rack (HMI).
  • Remove existing obsolete HMI/PLC cabinet.
  • Replace three (3) existing compact Programmable Logic Controllers (PLCs) with new Quantum PLCs.
  • Upgrade existing SAS elementary diagrams and rack wiring per latest SAS standards.
  • Install LSR Auto/Solid switch for the existing 66kV HCB relays.
  • Replace PLC annunciator alarm splitting diodes with auxiliary relays.
  • Prepare the necessary programming for the substation’s automatic response to pre-defined conditions.
  • Using a software simulator, verify the proper operation of this program.
  • Replace 66kV Bus Tie GCX and JBCG relays with SEL-311C relays.

More Projects

Windsor Hills Substation

Southern California Edison
4kV, 16kV, 66kV

Cudahy Substation

Southern California Edison
4kV, 16kV, 66kV

Barren Ridge Substation

LADWP
34.5kV, 220kV

Cadillac/Yorktown Substation

Baker Electric
34.5kV

Medicine Substation

Southern California Edison
12kV, 66kV

Sharp Phase III Wall

City of Anaheim