Scope:
  • Replace two (2) 66/16kV Transformer Banks with new 28MVA Transformer Banks.
  • Replace two (2) Potential Transformers (PT).
  • Replace four (4) circuit breakers and three (3) sets of group operated disconnect switches at each 66kV line position.
  • Add two (2) sets of bus sectionalizing disconnect switches.
  • Replace one (1) capacitor bank 16kV and add one (1) set of current limiting reactors (CLRs).