Cudahy Substation

Customer:
Southern California Edison
Load:
4kV, 16kV, 66kV
Date:
01/2023
Scope:

Replace two (2) 66/16kV transformer banks with two (2) new three-phase 28 MVA. Replace one (1) 66/4 kV transformer bank with one (1) three-phase 14 or 28 MVA unit. Replace six (6) 66/16kV load break disconnect switches.