Substation Electrical Installation (2023)

Kern County, CA

Substation Electrical Installation (2023)

Project Type:
Electrical
Load:
34.5kV, 220kV
Location:
Kern County, CA
Scope:

To perform the electrical installation on this project. This involves furnishing and installing various electrical equipment, components and materials. HV and MV Surge Arresters, Electrical Reactors, HV and MV Disconnect Switches, HV, MV and LV Cables, MV CT/PTs, Control Enclosure integration, Welded/Compressed/Bolted AL Bus Bar, Cooling system, Lightning Protection, Service station supply, Grounding grid.