Alhambra Substation

2320 Poplar Blvd., Alhambra, USA

Alhambra Substation

Customer:
Southern California Edison
Load:
66kV
Date:
02/2015
Scope:

Provide test support for:

  • Construction of new 66kV Switchrack in a breaker-and-a-half configuration with five (5) positions. Which includes testing of all CT’s, PT’s, CB’s, Lightning Arrestors, Transformer Banks, Potheads, associated control cables and grounding.
  • Prove protection for all new equipment.
  • Demo – Cut in the clear retired SL&P, (19) retired relay racks, (10) control panels, (1) DC Panel, (2) Large DC Boards, (1) HMI and (1) PLC Rack.