Scope:
Provide test support for:
- Construction of new 66kV Switchrack in a breaker-and-a-half configuration with five (5) positions. Which includes testing of all CT’s, PT’s, CB’s, Lightning Arrestors, Transformer Banks, Potheads, associated control cables and grounding.
- Prove protection for all new equipment.
- Demo – Cut in the clear retired SL&P, nineteen (19) retired relay racks, ten (10) control panels, one (1) DC Panel, two (2) Large DC Boards, one (1) HMI and one (1) PLC Rack.