Demo all equipment and foundations from three (3) 220kV Line Positions.
Install two (2) 220kV Circuit Breakers and OIC Cabinets.
Install four (4) 220kV Disconnect Switches, one (1) 220kV Line Drop, three (3) 220kV CCVTs, three (3) Lightning Arrestors, two (2) Relay Racks and all associated foundations, conduits and grounding.