Our Projects

Project description

Customer: Southern California Edison
Date: 10/27/14 – 11/27/14

Scope:

  • Install one (1) 18’x 12’x 8’ vault with manhole.
  • Encase and slurry eight (8) 5” PVC conduits form power cable trench to new vault (400’)
  • Encase and slurry nine (9) 5” PVC conduits form new vault to fence line (400’).
  • Rock Dust 100’ x 80’ area to meet SCE standards.
  • Let us power your next project